test-manager
2023.10
false
- Getting started
- Integrating with Studio
- Creating a project
- Quickstart guide
- Project management
- Project operations and utilities
- Test Manager settings
- ALM tool integration
- API integration

Test Manager user guide
Last updated Apr 22, 2026
Integrating with Studio
To complete the integration with Studio, you need to configure the Test Manager Settings.
Important:
- You need a Studio license. For more information, see About Licensing.
- If Studio is not yet activated or connected to your Orchestrator instance, see Activate Studio.
-
Open Studio and then start a new project or open a recent one.
-
In the Design ribbon, navigate to Test Manager > Test Manager Settings.
-
Go to Test Manager Configuration and enter your Test Manager URL.

-
Click Connect and log in using your Test Manager credentials.
-
Select your Default Project from the dropdown list.

-
Click OK to save changes.