- Getting started
- Project management
- Project operations and utilities
- Test Manager settings
- ALM tool integration
- API integration

Test Manager user guide
Linking test cases in Studio to Test Manager
linkYou can link a test case in Studio to a correspondent test case and requirement in Test Manager. To complete this action, you need to integrate Studio to Test Manager.
- In Studio, open an existing project or create a new Test Automation.
- Open an existing test case or create a new one.
-
In the Project, right-click a test case and select Link to Test Manager. Alternatively, you
can use Ctrl + Click for multiple selections to link multiple test cases to
a requirement.
Test Manager might require you to sign in, using your credentials.
- Configure the test case information:
- Project: Select your project. If you did not set a default project for Test Manager, see Integrating with Studio.
- Test: Select a test case from the dropdown list.
- Name: Enter a name only if you create a new test case in Test Manager.
-
Requirement: Leave this field blank if you don't want to link the test case to an existing requirement. The name is read-only in Test Manager. Alternatively, you can select a Requirement from the dropdown list if you want to assign the test case to a specific requirement in Test Manager.
- Click OK to confirm.
You can open the newly created test case in Test Manager, by navigating to Test Manager > Open Test.